
S&EC News

E. Geer Street Stream & Buffer Restoration Project
S&EC prepared restoration design plans for approximately 450 linear feet of piedmont stream and approximately 0.1 acres of riparian wetlands that were inadvertently impacted as a result of development activities on a property in Durham County, NC.
Lewtershop Road Stream & Wetland Restoration Project
S&EC prepared restoration design plans for approximately 550 linear feet of piedmont stream and approximately 0.5 acres of riparian wetlands in Chatham County, NC, that were inadvertently impacted as a result of development activities on an adjacent property.

Cross Creek Bank Repair & Stabilization Project
S&EC prepared repair and stabilization design plans for approximately 425 linear feet streambank along Cross Creek which failed during a hurricane event. The failure the stream bank, and an almost 50 foot high upper slope, is located immediately adjacent to the historic Cross Creek Cemetery in Fayetteville, NC.

Kernersville Pump Station Stream Restoration
S&EC prepared design plans for the restoration of approximately 120 linear feet of Piedmont stream and its associated riparian buffer along an unnamed tributary to Smith Creek in Kernersville, NC.

Catawba Falls Stream & Wetland Restoration
S&EC prepared restoration design plans for approximately 1,000 linear feet of mountain stream and approximately 3 acres of wetlands that were inadvertently impacted as a result of development activities within an 1,800 acre residential property near Black Mountain

Deporter Wetland Mitigation
S&EC provided site location, environmental permitting, design, construction supervision, and monitoring for two sites related to the mitigation for the Triangle Town Center Mall in Raleigh, North Carolina.