Garner Wastewater Treatment Facility in Wake County, NC

Image courtesy of raleighnc.gov

Project work consisted of Soil/Site Evaluation, Hydrologic Evaluation, Phosphorus Loss Assessment Study and Site Loading Capacity for a Proposed Spray Irrigation Wastewater System for the Garner Wastewater Treatment Facility, Wake County, North Carolina. The design daily flow was 500,000 GPD.

Emily Combs

Lead Designer, HALO 22

As Lead Designer at HALO 22, Emily brings a sharp eye for detail and over a decade of experience across screen, print, and brand work. When she isn't designing, you'll find her deep in a sci-fi novel, baking something chocolatey, or hanging out with her cats.

Previous
Previous

Coastal Studies Institute in Manteo, Dare County, NC

Next
Next

Deporter Wetland Mitigation