Coastal Studies Institute in Manteo, Dare County, NC
Project work consisted of Soil/Site Evaluation, Hydrologic Evaluation, and Site Loading Capacity for an Infiltration Basin Wastewater System. The design daily flow was 7,000 GPD. This project is currently in the construction phase.
Image source: Wikimedia Commons